Ross River Dam to Douglas Water Treatment Plant - Pipeline Duplication

Client: Townsville City Council

Role: Superintendency & Contract Administration – Inspection and Verification Services

Ross River Dam to Douglas Water Treatment Plant Pipeline Duplication required the design and construction of approx. 9.345km of predominantly buried 1290mm OD MSCL Pipeline from Ross River Dam Outlet to the Douglas Water Treatment to provide a duplication of the existing pipeline.

The Project exits the Ross Dam outlet, running along Riverway Drive and connects into and out of the Ross River booster pump station, continues along Riverway Drive then crosses the Ross River (open trench). Runs along the upper east bank of Ross River within the Mount Stuart Training Area traversing approximately 22 watercourses and connects into the Douglas Water Treatment Plant.

The Project has two cross connections from the new MSCL Pipeline to the existing DN1220 concrete pipeline.